100kVA Single Phase Pad Mounted transformer
- Primary Voltage Ratings 34.5-19.92/13.8-7.957/13.2-7.62/12.47-7.2, 24.94, 26.25, 33 or others
- Secondary Voltage Ratings 480-240/240-120or customized
- H.V. Tap Range ± 2×2.5% HV taps or others
- Type Loop Feed or Radial Feed
- BIL 30/95kV
- Standards CSA, IEEE, DOE, NEMA
- Application Ultility, Building, Residential etc
- Power Rating 100kVA
- Certificate UL/cUL, CSA, CESI
- Cooling Method ONAN, ONAN/ONAF, KNAN, KNAN/KNAF
- Oil Minerial Oil or FR3
- Opeartion Step Down & Step Up
Technical Specifications
Rated Power | 100 kVA |
Rating Primary Voltage | 11950Delta or Customized |
Secondary Voltage | 480-240V 240-120V 277V Customized |
Frequency | 50/60Hz |
Vector Group | Ii0,Ii6 |
Winding Material | Aluminum/Copper |
Efficiency | As IEEE,Doe 2016,CAS Std or Customized |
Impedance Voltage | Nominal 2% or Customized 1.1-5.75% |
Altitude | ≤1,000m or Customized |
Color | ANSI 70 Light gray/Munsell 7GY3.29/1.5 or customized etc |
Tank material | Mild Steel, 304 Stainless Steel |
Insulating Oil Weight | 230kg |
Total Weight | 710 kg |
Outline Dimensions(L×W×H)in. | 1200×965×910(mm) |
Lifting Lug | ELSP Fuse |
Hinged Door | BAY-O-NET Fuse |
Parking Bracket | Tap Changer |
Tank Cover | Oil Level Gauge |
L.V Bushing (4-Hole ) | Pressure Relief Valve |
Two/Four Position Load break Switch | Vacuum Pressure Gauge |
HV Grounding Copper Bar | Terminal Block |
Temperature Indicator | Door Handle |
H.V Bushing Well | Ground Strap |
Grounding Copper Bar | Nameplate |
1"'Drain Valve With 3/8" Sampler | Non-PCB decal |
1" Upper Fill Valve Filter Press Connection | High Voltage Warning Signs |
Customization Optional
Packing and Shipping


Manufacturer Test

Progress Test
NPC Electirc manufacture pad mounted transformer have the strict quality control. Progress testing of 100kVA single-phase vertically mounted transformers usually includes verification of key transformer performance to ensure that they meet design specifications and safety standards. Tests include, but are not limited to: no-load test (check no-load current and voltage), load test (verify performance under rated load), short-circuit test (detect temperature rise and current under short-circuit conditions), and insulation strength test (ensure the reliability of the insulation system). In addition, oil temperature test, mechanical strength test and electrical safety test will be performed. All test results will be used to evaluate the function and reliability of the transformer to ensure its stability and safety in actual operation.

Design Tests
All transformer will be test after finished the production, test items as below:
♦ Insulation Power Factor:
♦ Ratio, Polarity, and Phase Relation:
♦ Winding Resistance:
♦ Impulse Tests:
♦ On load Loss Test:
♦ No Load Loss Test
♦ Leak Test:
♦ DC Insulation Resistance Test
♦ Transformer Turns Ratio/TTR (All Tap Voltages)
♦ Impedance Voltage & Load Loss (Rated Voltage)
♦ Polarity, 1-Ph / Phase Relation, 3-Ph (Rated Voltage)
♦ Excitation & No-Load Loss (Rated Voltage)
♦ Applied Voltage
♦ Induced Voltage
♦ Lightning Impulse
♦ Insulation Resistance (Rated Voltage)
♦ Temperature Rise
♦ Dielectric Withstand (Hipot)

Transformer Factory Acceptance Test
NPC Electric will tests made for quality control by the manufacturer on every device or representative samples.
The Factory Acceptance Test (FAT) of the 100kVA single-phase vertically mounted transformer is to ensure that the transformer meets all technical specifications and quality requirements before leaving the factory. The main test items include: no-load test (check no-load current and voltage), load test (verify performance under rated load), short-circuit test (detect current, temperature rise and loss under short-circuit conditions), and dielectric strength test (ensure the reliability of the insulation system). In addition, temperature rise test, load loss and no-load loss tests are also performed to evaluate the energy efficiency performance of the transformer. Mechanical structure inspection, grounding protection and protection level verification are also part of the acceptance test. All test results will generate a detailed report to ensure that the transformer meets the design requirements and has safe and stable operation performance.
Routine Test - Transformer Turns Ratio/TTR (All Tap Voltages)
Voltage source: usually AC 10 V to 30 V , used to test different voltages for each tap.
Temperature and humidity meter: used to record environmental conditions during the test to ensure test accuracy.
Current probe: used to measure the load current of the winding and ensure the accuracy of the test results.
Perform the test under suitable environmental conditions: relative humidity below 75% and no rain (recommended temperature: 20-30°C). Avoid high humidity or bad weather that may affect the test accuracy.
The voltage ratio between the windings
Deviation of the measured value from the rated ratio
0.5% < Turns ratio error ≤ 1% (caution)
Turns ratio error > 1% (further inspection or corrective action required)

Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What is a Transformer?A transformer is an electrical device used to change the voltage of alternating current (AC). It works on the principle of electromagnetic induction, converting high-voltage current into low-voltage current or low-voltage current into high-voltage current. Transformers are widely used in power transmission, distribution systems, and various electronic devices.
-
What are the main uses of a transformer?The main use of a transformer is voltage conversion. Transformers are used in power transmission systems to help transfer electricity from power plants to consumers. In addition, transformers are also used in electronic devices such as chargers, televisions, power adapters, etc., to adjust the voltage to meet the requirements of different devices.
-
Do you have UL listed?Yes, our transformer has UL listed. We have exported to America many pad mounted transformer,substation transformer and HV.