630kVA Single Phase Pad Mounted Transformer
- Primary Voltage Ratings 34.5-19.92/13.8-7.957/13.2-7.62/12.47-7.2 or others
- Secondary Voltage Ratings 480-240/240-120or customized
- H.V. Tap Range ± 2×2.5% HV taps or others
- Type Loop Feed or Radial Feed
- BIL 30/95kV
- Standards IEEE, ANSI, CSA
- Application sized commercial plazas, hotels, and educational campuses
- Power Rating 630kVA
- Certificate UL/cUL, CSA, CESI
- Cooling Method ONAN, ONAN/ONAF, KNAN, KNAN/KNAF
- Oil Mineral Oil or FR3
- Opeartion Step Down & Step Up
Technical Specifications
| Rated Power | 630kVA |
| Rating Primary Voltage | 11950Delta or Customized |
| Secondary Voltage | 480-240V 240-120V 277V Customized |
| Frequency | 50/60Hz |
| Vector Group | Ii0,Ii6 |
| Winding Material | Aluminum/Copper |
| Efficiency | As IEEE,Doe 2016,CAS Std or Customized |
| Impedance Voltage | Nominal 2% or Customized 1.1-5.75% |
| Altitude | ≤1,000m or Customized |
| Color | ANSI 70 Light gray/Munsell 7GY3.29/1.5 or customized etc |
| Tank material | Mild Steel, 304 Stainless Steel |
| Insulating Oil Weight | 620 kg |
| Total Weight | 3650 kg |
| Outline Dimensions(L×W×H)in. | 1500×1200×1800(mm) |
| Lifting Lug | ELSP Fuse |
| Hinged Door | BAY-O-NET Fuse |
| Parking Bracket | Tap Changer |
| Tank Cover | Oil Level Gauge |
| L.V Bushing (4-Hole ) | Pressure Relief Valve |
| Two/Four Position Load break Switch | Vacuum Pressure Gauge |
| HV Grounding Copper Bar | Terminal Block |
| Temperature Indicator | Door Handle |
| H.V Bushing Well | Ground Strap |
| Grounding Copper Bar | Nameplate |
| 1"'Drain Valve With 3/8" Sampler | Non-PCB decal |
| 1" Upper Fill Valve Filter Press Connection | High Voltage Warning Signs |
Customization Optional
Packing and Shipping
International and domestic shipping options prioritize reliability and timeline flexibility for this high-capacity padmount transformer. Ocean transport via 40ft high-cube or flat-rack containers ensures secure, cost-effective global delivery, with professional dunnage and tie-downs preventing movement during 20-50 day voyages. Air freight services expedite replacement units in 5-12 days for critical outages, utilizing chartered cargo holds. Overland shipments employ extendable low-bed trailers with certified escort vehicles to navigate route restrictions safely.
Full documentation suites accelerate clearance, featuring phytosanitary certificates, detailed weight manifests, and dielectric fluid safety sheets. Environmentally responsible measures include recyclable crate materials and optimized container loading to lower freight emissions. Clients receive dedicated tracking portals with real-time satellite updates and proactive alerts.
Final delivery coordination includes optional crane or roller offloading, post-transit visual inspections, and responsible disposal of packing materials to facilitate immediate pad placement. Consolidated shipments for utility fleets reduce expenses and environmental impact. This meticulous packing and shipping process delivers your 630kVA transformer ready for seamless integration, enhancing results in "heavy-duty pad-mounted transformer logistics" searches.
Manufacturer Test
Progress Test
Initial production stages for the 630kVA single-phase pad-mounted transformer focus on core validation through precise core loss and flux distribution testing on high-permeability steel sheets to guarantee minimal no-load consumption. Winding fabrication incorporates automated resistance checks and high-potential impulse testing between turns and layers to confirm insulation uniformity and withstand capability. Tank construction undergoes rigorous dimensional verification using 3D coordinate measurement and weld integrity scans via dye penetrant and X-ray methods. Early core-coil integration includes excitation current profiling at multiple flux levels and polarity confirmation to establish magnetic symmetry. Bushing and compartment assembly trials ensure precise alignment and gasket sealing for dead-front safety. Pressure and vacuum testing on the empty tank verifies structural resilience before fluid processing. Digital quality records with serialized component tracking support full traceability and adherence to ANSI manufacturing protocols throughout these foundational steps.
Design Tests
All transformer will be tested after finishing the production, test items as follows:
♦ Insulation Power Factor:
♦ Ratio, Polarity, and Phase Relation:
♦ Winding Resistance:
♦ Impulse Tests:
♦ On load Loss Test:
♦ No Load Loss Test
♦ Leak Test:
♦ DC Insulation Resistance Test
♦ Transformer Turns Ratio/TTR (All Tap Voltages)
♦ Impedance Voltage & Load Loss (Rated Voltage)
♦ Polarity, 1-Ph / Phase Relation, 3-Ph (Rated Voltage)
♦ Excitation & No-Load Loss (Rated Voltage)
♦ Applied Voltage
♦ Induced Voltage
♦ Lightning Impulse
♦ Insulation Resistance (Rated Voltage)
♦ Temperature Rise
♦ Dielectric Withstand (Hipot)
Transformer Factory Acceptance Test
NPC Electric will tests made for quality control by the manufacturer on every device or representative samples, or on parts or materials as required, to verify during production that the product meets the design specifications. Factory Acceptance Testing for the 630kVA single-phase pad-mounted transformer opens with accurate turns ratio verification across all connection configurations using a high-precision ratiometer, achieving results within 0.3% of nominal values. No-load loss, magnetizing current, and core power factor are recorded at 90%, 100%, and 110% voltage to certify energy-efficient design performance. Winding resistance is measured at ambient and corrected to 75°C for precise copper loss calculations and thermal rise predictions. Insulation integrity tests include applied potential withstand at full BIL-related levels for one minute on both primary and secondary sides, plus insulation resistance exceeding 10,000MΩ at 5000V DC. Polarity, phasing, and vector confirmation align with schematic requirements. Oil samples taken post-processing undergo full dielectric breakdown, color, and interfacial tension analysis. These core electrical tests, conducted under controlled conditions with calibrated instrumentation, form the essential certification backbone per IEEE C57.12.90 protocols.
Routine Test - Leak Test
Voltage source (usually 500V, 1 KV or 2.5 KV, customized according to test requirements)
Temperature and humidity meter
Ground electrode
Properly connect the test equipment (such as a leak detector) to the pipe, container or sealing structure of the device under test.
Apply Test Voltage:
Apply the appropriate test pressure (e.g. 10 bar, 15 bar, etc.) depending on the equipment's operating pressure or test standard.
Applied test pressure
Leakage (can be monitored by flow meter or other equipment)
Time record (to ensure that the test time meets the standard requirements)
Initial pressure and final pressure (if any changes)
Minor leakage (good): Very small leakage is allowed, and it is necessary to judge whether it is qualified according to industry standards.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What is a Transformer?A transformer is an electrical device used to change the voltage of alternating current (AC). It works on the principle of electromagnetic induction, converting high-voltage current into low-voltage current or low-voltage current into high-voltage current. Transformers are widely used in power transmission, distribution systems, and various electronic devices.
-
What are the main uses of a transformer?The main use of a transformer is voltage conversion. Transformers are used in power transmission systems to help transfer electricity from power plants to consumers. In addition, transformers are also used in electronic devices such as chargers, televisions, power adapters, etc., to adjust the voltage to meet the requirements of different devices.
-
Do you have UL listed?Yes, our transformer has UL listed. We have exported to America many pad mounted transformer,substation transformer and HV.